Murphy’s
The $4.3m upgrade of the Murphy Reserve Pavilion has been completed. It was to have been opened on Sunday 22nd March. The plaque announcing its opening has been removed – awa
Port Places in the time of COVID-19
A State of Emergency was declared in Victoria on 16th March. In just one week we have experienced changes and adopted practices unimaginable a few weeks ago. People have retreated
Making it
Malcolm Moore Engineering Works started manufacturing in Port Melbourne in 1927. The factory covered 2.5 hectares and operated over several sites, the largest of which was on Willi
Yarra River-Birrarung
The 50 year community vision What is good for the Yarra is good for all Twenty four Victorians from all parts of the Yarra came together with representatives from the Wurundjeri Tr
‘Living Water’
The Yarra River downstream of the Westgate Bridge flows between neatly constructed boulder banks before opening out into Port Phillip Bay. The River’s course has been massive